In depth · Risk-Based Inspection
RBI: risk-based inspection for petrochemical and power plants
I consult on and implement RBI, from the methodology to getting it into software and into daily use. The focus is methodology, data quality and bringing the inspection plan into operations.
- PoF × CoF
- probability times consequence
- API 580 / 581
- methodology framework
- Petrochemical · Power
- focus sectors
- Consulting + Implementation
- scope of work
What RBI answers
Fixed-interval inspection treats every item alike. RBI ranks equipment by risk, then puts inspection effort where risk is high and relaxes it where risk is low, with reasons that are written down and can be checked.
What can fail?
Which equipment, where, and by which damage mechanism.
How large is the risk?
Risk = probability of failure (PoF) × consequence of failure (CoF).
How to inspect?
What to inspect, where, with which method and when.
The seven steps of an RBI study
Scope and data
Equipment in scope, design data, materials, operating conditions, inspection and repair history. The quality of this step sets the quality of every step after it.
Corrosion loops
Groups of equipment and piping with the same material, fluid and operating conditions, and therefore the same damage mechanisms.
Damage mechanisms
Identify the credible mechanisms for each loop: thinning, stress corrosion cracking, corrosion under insulation, high-temperature damage and so on (see API RP 571).
Probability of failure
From corrosion rate, remaining life, susceptibility to cracking mechanisms and the effectiveness of past inspections.
Consequence of failure
Safety of people, the environment, and the cost of lost production and repair.
Ranking and inspection plan
Place each item on the risk matrix, then decide the method, location, extent and timing of inspection that keeps risk below the acceptance level.
Keep it current
After every inspection, process change (MOC) or integrity operating window (IOW) exceedance, risk is recalculated. RBI is a living programme, not a one-off report.
Risk matrix
Click a cell to see the risk rank and the usual direction of response.
Probability of failure (PoF)
Consequence of failure (CoF)
Choose a cell
An illustrative matrix. Each company defines its own matrix, rating scales and risk acceptance levels.
Uniform thinning · Screening
Corrosion Rate & Remaining Life Screening
Estimate remaining life for uniform wall thinning, compare corrosion rates and explore the sensitivity of the result to your assumptions.
Scope: uniform wall thinning at a constant corrosion rate. Cracking, pitting, creep and other mechanisms need separate assessment. This screening tool does not calculate PoF/CoF or approve an inspection plan.
Screening results
- Remaining life at measurement date
- –
- Projected t_required date
- –
- Thickness margin
- –
- Selected rate
- –
- 50% remaining life reference
- –
- 50% RL reference date
- –
Enter thickness, required thickness and rate to see the result. Load an example to explore the tool.
Remaining life = (t_measured − t_required) / corrosion rate. Time is measured from the reading date using 365.25 days per year.
50% remaining life is a reference only. The inspection interval requires the applicable code and edition, equipment type, operating conditions, inspection effectiveness and site requirements.
Swipe the chart horizontally to view all axes and values.
Sensitivity to corrosion rate
| Scenario | Corrosion rate (mm/year) | Remaining life at measurement date | Threshold date |
|---|
Rate variation is a sensitivity assumption, not a confidence interval. Thickness and t_required remain fixed; only the rate changes. Projections assume constant corrosion conditions and do not represent actual failure dates.
For preliminary engineering discussion. Results depend on t_required, representative readings and the selected corrosion rate; a competent engineer must review them before operational or inspection decisions.
How petrochemical and power plants differ
Refining and petrochemical
The programme is organised by corrosion loop. Common mechanisms: thinning, stress corrosion cracking, corrosion under insulation, high-temperature hydrogen attack. The main consequence is release of flammable and toxic fluids.
Power generation
The focus is on boilers, superheaters, headers and main steam piping. Common mechanisms: creep, thermal fatigue, creep-fatigue, flow-accelerated corrosion, fireside corrosion. The main consequences are forced outages and safety when high-pressure steam is released.
Where RBI tends to fail
- Design data and inspection history are missing or unreliable, so the result only looks good on paper.
- Corrosion loops are drawn too coarsely and hide spots with a different damage mechanism.
- The effectiveness of past inspections is rated too high.
- It is done once and shelved: no update after inspection, after an MOC or when an IOW is exceeded.
- The inspection plan never reaches the CMMS/EAM, so it never becomes work orders.
Standards framework
How I can help with RBI
Review of an existing RBI programme
Checked against API RP 580, with the gaps in data, method and the way the programme is run.
RBI study
From data, corrosion loops and damage mechanisms to risk ranking and the inspection plan.
RBI software implementation
Configuration, data loading, result verification and user training on the chosen RBI platform.
Putting RBI into operation
Linking the inspection plan to the CMMS/EAM, and setting the update routine after inspections, MOCs and IOW exceedances.
The implementation scope follows each site’s data, critical equipment and inspection objectives.
Free RBI prompts in the library
Each task has 20 bilingual prompt styles: draft, review, checklist, risk register, executive brief and more.